{"id":30945,"date":"2018-05-21T11:21:46","date_gmt":"2018-05-21T04:21:46","guid":{"rendered":"http:\/\/pressocm.gov.kh?p=30945"},"modified":"2018-05-23T11:24:12","modified_gmt":"2018-05-23T04:24:12","slug":"construction-of-prek-kdam-thlea-maam-section-of-nr5-improvement-project-begins","status":"publish","type":"post","link":"https:\/\/pressocm.gov.kh\/en\/archives\/30945","title":{"rendered":"Construction of Prek Kdam-Thlea Ma\u2019am Section of NR5 Improvement Project Begins"},"content":{"rendered":"

AKP Phnom Penh, May 21, 2018 \u2013The construction of a road portion from Prek Kdam in Kandal province to Thlea Ma\u2019am in Pursat province with a total length of 135.21 kilometres started this morning in a ceremony held in Kampong Chhnang province.\"\"<\/a><\/span><\/p>\n

The groundbreaking ceremony was presided over by Samdech Akka Moha Sena Padei Techo Hun Sen, Prime Minister of the Kingdom of Cambodia and Japanese Ambassador H.E. Horinouchi Hidehisa.<\/p>\n

Built at an estimated cost of some US$261 million funded by an ODA loan from the Government of Japan and a budget of the Royal Government of Cambodia, the road portion is part of the Improvement Project of National Road No. 5.<\/p>\n

According to the Ministry of Public Works and Transports, the National Road No. 5 Improvement Project (Prek Kdam-Poipet) under JICA ODA loan is divided into three sections \u2013 North Section (Battambang-Serei Sophorn) of 84.74 kilometres long, South Section (Prek Kdam-Thlea Ma\u2019am) of 135.25 kilometres long, and Middle and End Section (Thlea Ma\u2019am-Battambang and Serei Sophorn-Poipet) of 146.04 kilometres long.<\/p>\n

The National Road No. 5 serves an importance rules in domestic transportation and eventually contribute to improvement of the interconnectivity of transportation sector between ASEAN and Mekong Sub-region.<\/p>\n

By C. Nika<\/p>\n

\"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a> \"\"<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"

Phnom Penh, May 21, 2018 \u2013The construction of a road portion from Prek Kdam in Kandal province to Thlea Ma\u2019am in Pursat province with a total length of 135.21 kilometres<\/p>\n","protected":false},"author":4,"featured_media":30939,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,10],"tags":[],"class_list":{"0":"post-30945","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-general-news","8":"category-news"},"acf":[],"_links":{"self":[{"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/posts\/30945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/comments?post=30945"}],"version-history":[{"count":0,"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/posts\/30945\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/media\/30939"}],"wp:attachment":[{"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/media?parent=30945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/categories?post=30945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pressocm.gov.kh\/wp-json\/wp\/v2\/tags?post=30945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}